NTT Manufacturing Intelligence
Demo build for NTT DATA
Lines
5
Machines
25
16 running · 2 down
Units Produced (30d)
125,584
Units Scrapped (30d)
2,846

Lines & Machines

MachineLineTypeStatusInstalled
Conveyor 1 Assembly Line 1 Conveyor running 2023-07-20
Conveyor 2 Assembly Line 1 Conveyor running 2022-11-30
Conveyor 4 Assembly Line 1 Conveyor running 2023-04-18
Robotic Arm 3 Assembly Line 1 Robotic Arm maintenance 2025-05-13
Conveyor 1 Assembly Line 5 Conveyor running 2024-03-31
Conveyor 2 Assembly Line 5 Conveyor down 2023-12-27
Conveyor 5 Assembly Line 5 Conveyor running 2025-03-27
Conveyor 6 Assembly Line 5 Conveyor running 2024-04-30
Robotic Arm 3 Assembly Line 5 Robotic Arm running 2025-12-23
Robotic Arm 4 Assembly Line 5 Robotic Arm maintenance 2024-02-26
Packer 2 Packaging Line 4 Packer maintenance 2025-01-05
Packer 3 Packaging Line 4 Packer down 2024-03-23
Packer 4 Packaging Line 4 Packer running 2022-06-26
Packer 5 Packaging Line 4 Packer running 2023-06-01
Palletizer 1 Packaging Line 4 Palletizer idle 2025-12-11
Curing Oven 2 Painting Line 3 Curing Oven maintenance 2025-09-13
Curing Oven 4 Painting Line 3 Curing Oven running 2023-04-01
Paint Sprayer 1 Painting Line 3 Paint Sprayer maintenance 2023-10-30
Paint Sprayer 3 Painting Line 3 Paint Sprayer running 2021-09-13
Laser Welder 2 Welding Line 2 Laser Welder running 2022-01-31
Laser Welder 6 Welding Line 2 Laser Welder running 2024-02-27
Spot Welder 1 Welding Line 2 Spot Welder running 2021-12-23
Spot Welder 3 Welding Line 2 Spot Welder running 2021-10-07
Spot Welder 4 Welding Line 2 Spot Welder idle 2021-10-10
Spot Welder 5 Welding Line 2 Spot Welder running 2025-11-11

Recent Downtime

MachineReasonStartedDuration
Spot Welder 4 planned maintenance 8/10/2026, 3:47:09 AM 179 min
Paint Sprayer 3 changeover 8/8/2026, 5:41:34 PM 145 min
Conveyor 1 material shortage 8/8/2026, 2:19:51 PM 261 min
Paint Sprayer 3 planned maintenance 8/7/2026, 2:48:06 PM 420 min
Robotic Arm 3 changeover 8/6/2026, 3:04:27 PM 70 min
Conveyor 6 planned maintenance 8/6/2026, 6:13:27 AM 359 min
Spot Welder 4 material shortage 8/5/2026, 8:08:59 PM 180 min
Conveyor 1 material shortage 8/5/2026, 12:21:36 AM 75 min
Paint Sprayer 3 material shortage 8/4/2026, 11:54:35 AM 190 min
Robotic Arm 3 material shortage 8/2/2026, 5:05:59 PM 140 min
Spot Welder 1 planned maintenance 8/2/2026, 2:36:02 PM 127 min
Conveyor 6 other 7/31/2026, 7:15:16 PM 334 min
Palletizer 1 unplanned failure 7/29/2026, 1:46:07 PM 345 min
Spot Welder 1 planned maintenance 7/27/2026, 10:34:06 PM 448 min
Packer 3 unplanned failure 7/23/2026, 9:14:17 PM 169 min
Conveyor 5 planned maintenance 7/23/2026, 6:17:59 PM 394 min
Conveyor 6 unplanned failure 7/23/2026, 2:20:51 PM 97 min
Conveyor 4 planned maintenance 7/22/2026, 5:41:13 PM 453 min
Laser Welder 6 other 7/21/2026, 10:03:26 AM 300 min
Conveyor 2 changeover 7/20/2026, 1:05:49 PM 119 min
Spot Welder 3 planned maintenance 7/20/2026, 11:14:41 AM 141 min
Spot Welder 1 planned maintenance 7/19/2026, 9:24:00 PM 376 min
Robotic Arm 3 planned maintenance 7/18/2026, 7:20:43 PM 412 min
Packer 5 planned maintenance 7/15/2026, 10:51:21 AM 175 min
Conveyor 4 changeover 7/14/2026, 3:20:09 PM 78 min

Recent Defects

ProductLineDefect TypeSeverityQtyDetected
Dashboard Assembly Assembly Line 5 weld crack low 4 8/11/2026, 12:07:06 PM
Drivetrain Unit Packaging Line 4 paint run low 3 8/11/2026, 8:36:37 AM
Dashboard Assembly Welding Line 2 surface scratch medium 3 8/11/2026, 8:11:48 AM
Drivetrain Unit Packaging Line 4 electrical fault medium 1 8/11/2026, 4:10:50 AM
Chassis Frame A1 Assembly Line 1 surface scratch high 1 8/11/2026, 2:56:30 AM
Battery Pack Module Painting Line 3 missing component low 2 8/10/2026, 10:01:41 PM
Bumper Assembly Packaging Line 4 dimension out of spec high 1 8/10/2026, 9:28:05 PM
Battery Pack Module Painting Line 3 misalignment low 2 8/10/2026, 4:58:26 PM
Battery Pack Module Painting Line 3 dimension out of spec low 1 8/10/2026, 3:33:10 PM
Door Panel Set Assembly Line 1 paint run high 8 8/10/2026, 3:05:38 PM
Bumper Assembly Packaging Line 4 dimension out of spec high 5 8/10/2026, 2:15:22 PM
Door Panel Set Assembly Line 5 paint run low 3 8/10/2026, 1:05:32 PM
Door Panel Set Assembly Line 5 electrical fault high 8 8/10/2026, 10:45:06 AM
Bumper Assembly Welding Line 2 dimension out of spec medium 1 8/10/2026, 8:47:55 AM
Door Panel Set Assembly Line 5 missing component medium 4 8/10/2026, 6:34:44 AM
Battery Pack Module Packaging Line 4 electrical fault medium 2 8/10/2026, 4:46:49 AM
Door Panel Set Painting Line 3 surface scratch medium 2 8/10/2026, 4:21:50 AM
Bumper Assembly Welding Line 2 paint run critical 5 8/10/2026, 1:21:55 AM
Door Panel Set Painting Line 3 missing component low 1 8/10/2026, 1:11:58 AM
Bumper Assembly Welding Line 2 electrical fault low 4 8/9/2026, 10:15:11 PM
Bumper Assembly Welding Line 2 misalignment critical 5 8/9/2026, 9:26:00 PM
Bumper Assembly Welding Line 2 dimension out of spec medium 8 8/9/2026, 6:12:46 PM
Bumper Assembly Assembly Line 1 electrical fault critical 5 8/9/2026, 5:36:00 PM
Battery Pack Module Assembly Line 5 weld crack high 3 8/9/2026, 5:07:05 PM
Drivetrain Unit Packaging Line 4 dimension out of spec medium 7 8/9/2026, 5:03:57 PM